OX2 has placed an order with the Nordex Group for the supply turbines for the 63 MW Wysoka wind project that will be located about 125 km southeast of Koszalin, Poland.
Nordex will supply eleven N149/5.X turbines, with a nominal capacity of 5.7 MW, on tubular steel towers with hub heights of 125 m for the wind project. The contract also includes a Premium Service for the turbines covering a period of 30 years.
The installation of the turbines is due to begin in mid-2023 and is planned to be commissioned in 2024. OX2 will then take over technical and operational management of the wind farm for the owner, the Ingka Group.
PAK-Polska Czysta Energia, a Polish renewable energy developer, has completed the acquisition of a 72.6 MW onshore wind project located in Czluchow, Poland from Neo Energy Group, a private equity...
Read moreIngka Investments, the investment arm of Ingka Group, has completed the acquisition of the ready-to-build wind farm and solar park located in north-western Poland for a total investment of EUR190...
Read moreIberdrola SA has started the construction of its 50.5 MW Korytnica II wind farm located in the Mazowieckie region, northeast of Warsaw in Poland. The project consists of 14 V123-3.45...
Read morePKN Orlen has entered a deal to lease a site on which a base will be built for the service operation vessels to maintain around 70 wind turbines for the 1.2 GW offshore wind project in Poland. ...
Read moreAxpo has signed two power purchase agreements (PPAs) with Mirova Eolska and Uriel Renovables for two onshore wind farm projects with a combined installed capacity of around 165 MW in Poland....
Read more