Portugal-based CJR Renewables has completed the installation of all wind turbines at the 162-MW Matkussaari wind project in Finland.
The job was done under a contract with German wind turbine maker Nordex SE. CJR installed 27 machines of the Nordex N163_TS148 type, each of 6 MW. The Matkussaari project is executed in the Ostrobothnia region and is part of the Viiatti wind complex.