Yates Electrical Services (Yes Group) and Sustainable Energy Infrastructure (SEI) have commissioned the 5 MW Woods Point Solar and Battery Storage Farm located in South Australia.
The facility consists of 9,000 bi-facial Risen Solar panels mounted on a Nextracker frame and a 2.5 MWh battery storage system.
The project is one of three solar-plus-storage systems inaugurated in South Australia in December; the other two are in Port Wakefield and Padthaway.