Qair starts commercial operation of 12.8 MW wind project in Olszówka

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

Qair has commissioned the 12.8 MW wind farm located in Olszówka, in the Wielkopolskie Voivodeship, Poland. 

The project consists of four 2.2-MW and two 2-MW wind turbines supplied by Vestas. The wind farm is designed to generate 43 GWh of clean energy annually.

Qair now owns and operates seven wind projects in Rzepin, Linowo, Udanin, Września, Parzęczew, Rychwał, and Olszówka generating electricity through a total of 93 wind turbines with an installed capacity of 205 MW. 

Share this update