Octopus Renewables Infrastructure Trust, part of the Octopus Group, is to acquire 100% of the rights to construct a 50 MW onshore wind farm in South Lanarkshire, Scotland from RDC Partners.
The transaction and the construction of the Cumberhead project will cost an estimated GBP75 million (US$105.8 million).
The 12-turbine wind farm is expected to start operations in the fourth quarter of 2022.
Moray Offshore Windfarm (East) Ltd has commenced exporting power to the National Grid, for use by homes and industry across the UK. The wind farm is still under construction, but the engineering meth...
Read moreZenobe Energy Ltd plans to build a 50 MW battery energy storage facility in Wishaw, North Lanarkshire in the UK. The construction rights on the site have been secured. The project is expected t...
Read moreThe environmental and geophysical surveys will be conducted during the next three months for the 504 MW North Falls offshore wind farm, located about 20 kilometers from the East Anglia coast...
Read moreAura Power has planned to develop the Hawthorn Pit solar project, with a capacity of up to 49.9 MW, located between Murton and South Hetton, in County Durham, England. The solar farm will be built wi...
Read moreAura Power has planned to develop the Hawthorn Pit solar project, with a capacity of up to 49.9 MW, located between Murton and South Hetton, in County Durham, England. The solar farm will be built wi...
Read more