Energy Vault Holdings Inc has been selected to provide the engineering, procurement, and construction (EPC) services for the 68.8 MW/275.2 MWh Stanton Energy Storage System (SESS) Project in California, USA by Wellhead Electric Company and W Power.
The project will be operated by Wellhead Services, Inc., a unit of Wellhead Electric. The energy storage system will be built on Energy Vault Solutions’ (EVS) proprietary integration platform and powered by EVS’ energy management software. The EVS platform, which was introduced in Q4 2021, leverages advanced software architecture and optimization algorithms and enables the integration and orchestration of multiple energy assets under a multitude of use cases.
The project is targeted for completion in mid-2023.
BASF and X-ELIO have signed a 12-year Power Purchase Agreement (PPA) in which the 72 MW Liberty solar photovoltaic (PV) project in Houston will provide 48 MW of solar energy to BASF's Verbund plant in...
Read moreEDF Renewables North America has signed a 15-year virtual power purchase agreement (VPPA) with McDonald’s Corp for the 255 MW AC/332 MW DC Apollo Solar photovoltaic (PV) project located in Texas...
Read moreSummit Ridge Energy (SRE) and Qcells have announced three standalone energy storage projects in New York City, USA. As part of New York State's Value of Distributed Energy Resources (VDER) program, th...
Read moreSiemens Gamesa Renewable Energy SA has secured an order to supply 84 SG 11.0-200 DD turbines for the 924 MW Sunrise Wind offshore project to be erected off the coast of Montauk Point, New York, USA....
Read moreIberdrola has entered into an agreement with Swiss infrastructure investor Energy Infrastructure Partners (EIP) for the sale of the 49% stake in the 350 MW Wikinger wind farm project located...
Read more