Voltalia signs O&M contract with Alianca for 98.7 MW Santo Inácio Wind Complex in Icapui

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

Voltalia has signed a contract with Aliança Geração de Energia to provide operation and maintenance services at the 98.7 MW Santo Inácio Wind Complex in Icapui, in Icapuí, Ceará.

The Aliança Geração de Energia complex has 47 wind turbines and installed capacity of 98.7 MW.

Voltalia will perform a performance analysis of wind turbines and operation and maintenance services performed by the turbine manufacturer through inspections detailed on the wind turbines and an internally developed analytics platform called Analytics Engine.

The contract for the provision of the service lasts for five years and begins in September 2020.

List of the country updates

Country updates

  • October 06, 2020

    STOA takes a 33% equity stake in Voltalia’s VSM 3 wind plant

    Voltalia announced on that STOA is acquiring a 33% equity stake in Ventos Serra do Mel III (VSM 3), Voltalia’s 152 MW greenfield wind farm, located in Rio Grande do Norte, Brazil. Followin...

    Read more
  • October 05, 2020

    CGN to invest BRL144mn to expand wind farms in Piauí

    CGN Brasil Energia has signed the main contracts for works involving the expansion of the Lagoa do Barro wind farm, resulting from the A-6/2019 Energy Auction. The project involves an increase of...

    Read more
  • October 02, 2020

    CADE approves AES Tiete Energia purchase of 420 MW wind portfolio

    The Administrative Council for Economic Defense (CADE) of Brazil has approved the acquisition of up to 420 MW wind portfolio by AES Tiete Energia SA. The deal covers the sale of 14 spe...

    Read more
  • October 02, 2020

    Statkraft to built 519 MW wind complex in Bahia

    Norwegian state-owned energy company Statkraft AS is set to break ground for the construction of a 519 MW wind complex in Brazil by January 2021. The company will invest up to BRL.5 billion (US$...

    Read more
  • October 01, 2020

    Brazil starts operation of Coremas Phase 3 project

    The Ministry of Mines and Energy (MME) of Brazil has started the commercial operation of the 30 MW Phase III of the 312 MW Coremas photovoltaic (PV) complex in Paraiba state.  The ...

    Read more

Share this update