Nordex Group has received an order from AES Argentina Generación, a subsidiary of the energy provider AES Corporation, for the delivery of 30 AW132/3300 turbines for the Energetica I project.
Energetica I is located in the Province of Buenos Aires near Bahia Blanca. The location is characterised by average wind speeds above 10 metres per second. Once complete, it will have a total installed capacity of 99 MW.
The Nordex Group will be assembling the turbines locally in Argentina and will be manufacturing the 120m high concrete towers locally as well. The contract also comprises a multi-year service for the wind farm.
Located in the Villarino district of Villarina 33 kilometers south of the city of Bahía Blanca, La Castellana wind farm has been ianugurated. The park will provide 99 MW of renewable energ...
Read moreYPF Luz will supply 15.9 MW of wind power to Toyota's factory in the Argentine town of Zarate, Buenos Aires province, during a period of 10 years. The power will come from two win...
Read moreArgentina's Ministry of Energy and Mines has signed and awarded contracts for the winners of 107.2 MW from the RenovAr 2 renewable energy auction. The project included are: 1.2 MW CT B...
Read moreArgentina has signed eight contracts with winners of the RenovAr 2 renewable energy auction for a combined capacity of a little over 141 MW. The contracts for the renewable energy projects involved on...
Read moreConstruction works has commenced in the 80 MW solar PV project in Argentina's Salta province. The construction will be carried out with 30% of local components and it is estimated that the solar...
Read more