Ignitis Grupe AB has started the construction of the 50 MW wind farm project located in the Lower Silesian Voivodeship of southwestern Poland with a total investment of about EUR70 million (US$71.00 million).
The wind farm will consist of 14 3.6-MW turbines that will be supplied by Nordex. CJR Renewables will handle the construction of the project which is targeted for operation before the end of 2023.