Guzman Energy secures development approval for 80 MW Garnet Mesa solar PV project in Colorado

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

Guzman Energy has secured approval from the Delta County Board of Commissioners for a limited use permit required for the development and operation of the 80 MW Garnet Mesa Solar photovoltaic (PV) project located in Southern Delta County, Colorado, USA. 

The solar farm is expected to generate up to 194 GWh of energy per year once operational which is enough for the consumption of up to 18,000 homes. The energy produced by the project will be sold to the Delta-Montrose Electric Association (DMEA) with the remaining power sold separately to wholesale customers.

With the received permit, the developers of the project will now commence the engineering and procurement planning of the solar farm with the construction phase to follow in the following months. 

List of the country updates

Country updates

  • August 23, 2022

    Pivot Energy acquires solar developer SGC Power

    Pivot Energy has announced the acquisition of SGC Power, a community solar developer based in Maryland, USA. Since 2008, SGC Power has been involved in over 285 solar photovoltaic projects, totaling o...

    Read more
  • August 23, 2022

    FlexGen Partners to supply tech for on 100 MW energy storage projects in Texas

    FlexGenPower Systems, Inc. has signed contracts with SMT Energy to provide energy storage systems and HybridOSTM software for the 100 MW energy storage portfolio that will be constructed in Texas, USA...

    Read more
  • August 22, 2022

    Cleco Power, DESRI ink offtake deal for 240 MW AC solar project in Louisiana

    Cleco Power and D.E. Shaw Renewable Investments (DESRI) have signed a long-term power purchase agreement (PPA) for the 240 MW AC Dolet Hills Solar Project to be built at the decommissioned Dolet Hills...

    Read more
  • August 19, 2022

    NADBank provides financing for a 208 MW solar PV farm in USA

    The North American Development Bank has signed a US$49.1 million loan for the Zier Solar and Energy Storage Project located in Kinney County, Texas, USA.

    Read more
  • August 19, 2022

    Innergex, PacifiCorp sign PPA for 320 MW wind project in Wyoming

    PacifiCorp and Innergex Renewable Energy Inc. have signed a 30-year power purchase agreement (PPA) for the 320 MW Boswell Springs wind project in eastern Wyoming, USA. The US$544 million wind farm is...

    Read more

Share this update