Ireland’s Greencoat Renewables has completed the acquisition of a 50% stake in the 80.5 MW South Meath Solar Farm in County Meath, located in east Ireland.
The stake previously owned by Norwegian hydropower company Statkraft has been sold, with funds managed by Schroders Greencoat acquiring the remaining 50%. Greencoat has also secured a long-term power purchase agreement (PPA) with a technology company for 100% of the solar farm’s output. The South Meath Solar Farm in County Meath, Ireland, became operational at the end of 2023. The project was developed, financed, and constructed by Statkraft, which had acquired it from Lightsource BP.
ESB has announced that Voltalia will be the main engineering, procurement and construction contractor for the development of the 57 MW Middleton House Solar Farm, located to the northeast of Lanesboro...
Read moreSSE Renewables and FuturEnergy has announced the official opening of the 30 MW Lenalea Wind Farm in County Donegal, Ireland.
Read moreSSE Renewables and FuturEnergy Ireland have jointly announced that Microsoft has entered into a long-term Corporate Power Purchase Agreement (CPPA) for the 30 MW Wind farm newly commissioned Lena...
Read moreSSE Renewables has announced that the turbine installation for its 101 MW Yellow River Wind Farm, located outside Rhode in County Offaly, has reached the halfway point.
Read moreCodling Wind Park has announced the appointment of the international engineering firm COWI for the Front End Engineering Design (FEED) and Detailed Design of foundations for the 1.3 GW wind farm in Ir...
Read more