Sunpin Solar has started the construction of its 98 MW Titan Solar 1 Project in California.
Located on a 569-acre land between Salton Sea and Anza Borrego Desert State Park in Imperial County, Titan Solar 1 Project will be comprised of over 260,000 panels and will generate over 218,000 MWh of renewable energy each year, which is enough to power over 26,900 homes annually. The project is anticipated to be operational in Q4 2020.
Titan Solar 1 Project is interconnected to the grid of Imperial Irrigation District and has a greenhouse gas (GHG) equivalency of offsetting over 154,300 tons of CO2 emissions each year. Titan Solar 1 project will create over 400 green jobs during peak construction.