Siemens Gamesa Renewable Energy has received a firm order for the supply of wind turbines to the consortium composed of Nareva, Enel Green Power, and Siemens Wind Power for the Boujdour wind farm, located in southern Morocco, with a total capacity of 301 MW.
The Boujdour wind farm is part of the 850 MW tender in Morocco awarded to the consortium in 2016. The firm order includes the supply, transport, installation, commissioning, and testing of 87 SG 3.4-132 wind turbines and a 5-year service contract. The project is expected to enter service in the third quarter of fiscal 2022.