Neoenergia has started the commercial operation of the 34.65 MW wind project located in Paraiba state, Brazil.
The project consists of 10 wind turbines and is a part of the 471.25 MW Chafariz wind complex, which will comprise 136 turbines in total across 15 wind farms in Paraíba.
The remaining turbines are in the test phase.