Greencoat Capital has entered into an agreement to acquire 100% of Margam Green Energy Plant (MGEP), a waste wood-fired biomass plant located in Port Talbot, South Wales, from Glennmont Partners (Glennmont).
MGEP has been operational since May 2019 and is one of the largest biomass plants in the UK, with a processing capacity of around 290 thousand tonnes per annum (ktpa) of waste wood. The plant’s net capacity of 41.8MW is sufficient to offset around 150,000 tonnes of CO2 per year.
The team building Dogger Bank Wind Farm has officially marked the start of its offshore construction work with the installation of the first length of HVDC export cable off the Yorkshire coast. NKT i...
Read moreOctopus Renewables Infrastructure Trust has signed an agreement to acquire a 7.75% stake in the 270 MW Lincs offshore wind farm project located off the English coast in the UK. The project...
Read moreNKT announced that it has commissioned the 196 km 220 kV HVAC power cable system for the Hornsea 2 offshore wind farm.
Read moreAn early consultation is underway with the commercial fisheries sector as the team at Gwynt Glas reveals details of the location of their 1,500 square km site search area in the Celtic Sea. Gwynt Glas...
Read moreJan De Nul Group has signed a contract with Sumitomo Electric Industries, Ltd. (Sumitomo Electric) for the installation of two subsea HVDC cables and one fibre optic cable that will link the existing...
Read more