Enel Green Power Spain is set to start the construction of its 35 MW Primoral wind project in July 2019.
The project will be developed in the town of Villamayor de Gallegó, in the Province of Soria, Spain. The facility will consist of 10 wind turbines measuring 114 meters tall up to the rotor shaft, and will each generate approximately 3.465MWh of energy. This represents an 88,050 ton reduction in CO2 emissions on an annual basis – the equivalent of 27,281 homes’ annual consumption.
The facility will provide energy for BBVA through the Spanish utility, Endesa.