The Provincial Goverment of Castilla-La Mancha has issued an environmental impact statement (EIS) for the 44.45 MW/49.977 MWp Antilia solar photovoltaic project located in the municipality of Puertollano, Ciudad Real province.
Antilia Energias Renovables SL, the developer of the project, plans to install up to 133,272 units of Longi solar's LR6-72PH 375MW 375-Wp modules mounted on solar trackers PV modules spread in around 95 hectares.
The project is set to be completed after four years of construction.
Foresight Group has started the operation and connected to the grid its 50 MW solar photovoltaic project developed in the municipality of Puebla de Guzman in Huelva, Andalusia. The project, con...
Read moreEndesa SA has secured an environmental impact statement (EIS) for the development of the 49.97 MW Apicio and 49.11 MW Nertobriga solar PV plants located in the municipality of Fregenal de la Sierra, B...
Read moreThe 48.4 MWp Spanish solar photovoltaic (PV) project proposed by Castilblanco Solar SL has received a favorable environmental impact statement (EIS). The El Doblon solar facility will be installed i...
Read moreEDP Renováveis, SA (EDPR) has signed a purchase agreement with Finerge SA for the sale of EDPR's entire shareholding - and outstanding shareholder loans - in a portfolio of Spanish onshore wi...
Read moreEndesa, through its renewable energy division Enel Green Power Spain, has connected a 51 MW wind farm in the town of Motilla del Palancar, in the province of Cuenca, to the electricity grid. The proj...
Read more