Foresight Group has started the operation and connected to the grid its 50 MW solar photovoltaic project developed in the municipality of Puebla de Guzman in Huelva, Andalusia.
The project, consists of about 150,000 solar panels, was acquired by Foresight in April 2019. The Spanish contractor Solaer has commissioned to build the project.
Foresight has signed a 10-year power purchase deal with the EDF Trading for the energy produced in the solar plant.