National Hydroelectric Power Corp. (NHPC) has awarded an Engineering, Procurement, and Construction (EPC) contract to Adani Infra Ltd for the development and construction of a 600 MW solar photovoltaic project located in the state of Gujarat, India.
The project is expected to be completed within 18 months.
The contract was signed on June 9, 2022, under the CPSU scheme Phase-II.