Preferred bidder selected for 1.32 GW Offshore wind Transmission Link project

Subscribe to our newsletter and get the latest news and business opportunities in your inbox
Preferred bidder selected for 1.32 GW Offshore wind Transmission Link project

Diamond Transmission Partners, a consortium comprised of Mitsubishi Corporation and HICL Infrastructure plc, has been selected by Ofgem as the preferred bidder to own and operate the GBP1.2 billion (US$1.4 billion) high voltage transmission connection link project that will serve the Hornsea 2 offshore wind farm located 89 km off the Yorkshire coast of the UK.

Ørsted’s 1,320 MW Hornsea 2 wind farm will have up to 165 SG 8.0-165 DD wind turbines of 8 MW. The project will be connected to the grid via a high-voltage transmission connection link. The 245 kV high-voltage cables with a total length of over 200 km, including three far-shore cables, cover about 50% of the entire project and connect the wind park to the reactive power compensation platform that brings electricity to the mainland. 

Share this news

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.