Antaisolar to supply tracking system for 187 MW solar PV project in Brazil

Subscribe to our newsletter and get the latest news and business opportunities in your inbox
Antaisolar to supply tracking system for 187 MW solar PV project in Brazil

Antaisolar has signed a contract with Cia Energetica de Minas Gerais SA (Cemig) to deliver a 187 MW tracking system for a solar photovoltaic (PV) project in Minas Gerais, Brazil.

Antaisolar will equip the solar farm with TAI-Simple slew-drive single-axis 1P tracker. The device will ensure the system's stability with dampers on both sides that protect the torque tube. It is anticipated that the accurate monitoring of the tracker contributes 10% to 15% greater power output compared to stationary structures.

The project is slated to be linked to the power grid in Q3 of 2023. It is expected to produce 220 GWh of clean power per year, therefore saving 221,725 tons of carbon emissions.

 

List of country news

Country news

  • October 06, 2022

    Vestas to supply turbines for 846 MW Onshore wind farm in Brazil

    Vestas has signed an agreement with Engie Brasil Energia SA to supply wind turbines for the Serra de Assuruá wind park in the state of Bahia, in the municipality of Gentio do Ouro, Brazil.

    Read more
  • September 28, 2022

    Financial close achieved for 210 MW Solar PV project in Brazil

    Lightsource bp has announced the financial close for its Milagres solar photovoltaic park located in Abaiara, in the state of Ceará, Brazil.

    Read more
  • July 29, 2022

    Lightsource bp signs PPA for 210 MW Solar PV project in Brazil

    Lightsource bp has signed a 15-year power purchase agreement (PPA) with America Energia for the 210 MWp Milagres solar photovoltaic (PV) project in Abaiara.

    Read more
  • July 11, 2022

    Power purchase agreement signed for 531 MW Solar project in Brazil

    Hydro Rein, Equinor and Scatec have signed a PPA for the Mendubim solar project in the state of Rio Grande do Norte in Brazil.

    Read more
  • June 17, 2022

    Neoenergia starts test operation for 566.5 MW Wind complex in Brazil

    Neoenergia has started the operational tests for the first 7 wind turbines of the 566.5 MW Neoenergia Oitis wind complex located between the states of Piauí and Bahia, Brazil.

    Read more

Share this news

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.