Quadran International has through its subsidiary Quadran Brasil, placed an order for the 206 MW Serrote wind park to be located at the municipality of Trairí, in the state of Ceará. The contract includes the supply and installation of 49 V150-4.2 MW wind turbines with a 125-meter hub height. The power from Serrote wind park will be supplied to the Brazilian utility CEMIG through a PPA agreement with Quadran.
Turbine delivery is expected to commence in 2020 and commissioning is planned for 2021.
Votorantim Energia and Canada Pension Plan Investment Board has announced that a consortium formed by their joint venture has acquired the controlling stake in Brazilian hydro generation company Compa...
Read moreThe Brazilian unit of Honda Motor Corporation, Honda do Brasil, is set to build the 30 MW wind project in the state of Rio Grande do Sul. The facility, consists of nine wind turbines,...
Read moreVestas has received a 361 MW order to supply and install 86 V150-4.2 MW wind turbines for the Campo Largo Phase 2 wind park to be located at Sento Sé and Umburanas municipalities, State of Bahi...
Read moreRenova Energia's board of directors has approved AES Tiete Energia's proposal to bid for the 400 MW Alto Sertao III wind project. The value of the bid remains undisclosed. The project involves the in...
Read morePátria Investimentos, the Shell Group and Mitsubishi Hitachi Power Systems (MHPS) have announced the construction and operation of the gas-based thermal power plant Marlim Azul in Macaé,...
Read more