Total Eren acquired the 90% stakes in the 92 MW Terra Santa wind project from the Vila Energia Renovável. The project is located in Rio Grande do Norte, Brazil.
Total SA is based in France. It’s their first wind energy asset in Brazil. Vila Energia Renovável is a local energy company of Brazil. It will retain 10% stake in the project.
The wind complex has a 20-year long-term power supply contract already signed with Brazilian utility Cia Energetica de Minas Gerais SA, better known as Cemig. Expected to start production in 2021, the facility requires BRL 410 million.
Total Eren had previously bought 3 solar parks with a combined capacity of 140 MW in Brazil.
Votorantim Energia and Canada Pension Plan Investment Board has announced that a consortium formed by their joint venture has acquired the controlling stake in Brazilian hydro generation company Compa...
Read moreThe Brazilian unit of Honda Motor Corporation, Honda do Brasil, is set to build the 30 MW wind project in the state of Rio Grande do Sul. The facility, consists of nine wind turbines,...
Read moreVestas has received a 361 MW order to supply and install 86 V150-4.2 MW wind turbines for the Campo Largo Phase 2 wind park to be located at Sento Sé and Umburanas municipalities, State of Bahi...
Read moreRenova Energia's board of directors has approved AES Tiete Energia's proposal to bid for the 400 MW Alto Sertao III wind project. The value of the bid remains undisclosed. The project involves the in...
Read morePátria Investimentos, the Shell Group and Mitsubishi Hitachi Power Systems (MHPS) have announced the construction and operation of the gas-based thermal power plant Marlim Azul in Macaé,...
Read more