Statkraft has entered into a Power Purchase Agreement (PPA) with Matrix Renewables to acquire energy from its 50 MW solar park in Jaen, Spain.
The long-term contract will run for 10 years and will start in the second half of 2022 when the PV plant is fully operational. The 50 MW solar project is one of the largest in Jaen. It will supply its entire production to Statkraft during the PPA term.
The Ministry for the Ecological Transition and the Demographic Challenge (MITECO) has submitted to public information the resolution calling the third auction to grant the Renewable Energy Economic Re...
Read moreBayWa r.e. and Holaluz have signed a 10-year Power Purchase Agreement (PPA) for a 20 MWp solar park near Poblete in the Castile-La Mancha region of Spain. The project will be built exclusively on sin...
Read moreMytilineos S.A., through its Renewables and Storage Development (RSD) Business Unit, and Aquila Capital have signed an agreement for the sale of a 100 MW solar portfolio in the South of Spain. As part...
Read moreFotowatio Renewable Ventures (FRV) has started the operation of its 138 MW solar photovoltaic project in the Extremadura region of Spain. The San Servan 220 solar PV farm consists of...
Read moreNextEnergy Capital (NEC), has reached the final close for its NextPower III ESG (NPIII ESG), bringing the total capital raised to US$896 million, including an SMA. Including co-investments closed to d...
Read more