Solaria Energia has started the commercial operation of the 30 MW Polenino solar PV park in Aragon, Spain.
It has 80,000 modules and an installed capacity of 30MW. It will generate about 60 GWh per year, equivalent to the consumption of a population of 18,300 inhabitants and prevent the emission of 12,100 tons of CO2 per year.
This installation belongs to the 250MW that were awarded to Solaria in the Spanish renewable auction in July 2017.