Shizen Malaysia Sdn. Bhd., an affiliate company of Shizen Energy Inc. has reached commercial operation on its Hau Giang Solar Power Plant (35MWp (DC)), a large-scale solar power plant in Vietnam in which Shizen Energy has invested and managed the construction. This project is the second joint project with local partner Halcom Vietnam JSC. and the first solar power project in Vietnam for Shizen Energy Group.
Shizen Malaysia and Halcom jointly constructed this power plant on 33ha of land in Hung Hiep District, Hau Giang Province, south of Vietnam. The plant is the first solar power plant in Hau Giang province. The project received strong support from Hau Giang government authorities and good cooperation from the residents. The project was implemented within a short period of 6 months since June 2020 with the investor, partners, contractors, and owner’s Engineers’ joint efforts. Shizen Energy contributed to the project’s technical and investment aspects, including technical design and construction management, drawing on the Group’s domestic and international expertise in development, EPC, O&M, and asset management.
The expected annual output is about 51 million kilowatt-hours, and the electricity generated is sold to Vietnam Electricity (EVN). Supplying clean, renewable energy from this solar power plant, the project will contribute to the region’s economic development and lower its carbon footprint.