NTR has signed a power purchase agreement, with a European utility as part of its financing of 94 MW of wind projects in Sweden and Finland.
The utility will offtake 70% of the power generated over the next 15 years by Trattberget, a 69 MW wind project in the portfolio. The power produced by the remaining two projects will continue to avail of existing revenue arrangements. An existing offtake arrangement is in place with an industrial pulp mill for the 10 MW Skutskär project in Sweden and the 15MW Svalskulla wind project avails of the Finnish feed-in-tariff system.
Nord/LB was mandated by NTR to provide EUR37 million (US$37.53 million) of debt facilities to the portfolio of three projects, which became operational between 2009 and 2014.
DLA Piper and Pexapark provided legal and commercial advice respectively to NTR.
Vestas has been commissioned to provide turbines for the 155 MW Åby-Alebo wind energy project of Stena Renewables AB. Located in Mönsterås Municipality, the project will be...
Read moreAF Gruppen ASA, through its unit Kanonaden Entreprenad AB, has been awarded to build the 155 MW Aby-Alebo wind project in Sweden. The construction group will design and build roads, fo...
Read moreFortum and Credit Suisse Energy Infrastructure Partners (CSEIP) have signed an agreement whereby funds advised by CSEIP will acquire an 80% stake in Fortum’s Nordic wind portfolio. Fortum will...
Read moreSiemens Gamesa Renewable Energy has closed the acquisition of the assets of the European division of Senvion Services, as well as its intellectual property (IP). The transaction amounts to approximate...
Read moreArdian and Nordic developer OX2 have switched on Nordex's 5 MW class turbines for the 286 MW Åndberg wind farm. The Nordex Group had already booked this order comprising 53 turbines as order int...
Read more