Nordex to equip 131 MW Hocksjon wind project in Vasternorrlands lan

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

The Nordex Group has received an order for its N163/5.X turbines of the Delta4000 series about 131 MW in Sweden. The utility Jämtkraft and its partner Persson Invest ordered 23 turbines from the Nordex Group for the Hocksjön wind farm. The order also includes a Premium Service of the turbines covering the period of 25 years.

The installation and completion of Hocksjön will take place in 2022. The wind farm will be built about 20 kilometers southwest of Ramsele in the province of Västernorrlands län. The turbines will be delivered in the operating mode of 5.7 MW and with a hub height of 148 meters. Due to the harsh winters with temperatures down to minus 33 C on site, the turbines are designed as a cold climate variant. Because of the large rotor diameter and the high installed rated power, the N163/5.X turbines are ideally suited for the site with medium wind speeds.

Share this update