Iberdrola has awarded a contract to Siemens Gamesa for the supply of SG 4.5-145 wind turbines, with a 4.5 MW power unit.
The Herrera Complex, which will be built in Burgos province, is made up of three wind farms - La Huesa, Valdesantos, and Orbaneja - and will have an installed capacity of 63 megawatts (MW), distributed between a total of 14 wind turbines. The complex is expected to be operational in 2020.
The Orbaneja and La Huesa wind farms will be located in the municipalities of Isar, Las Quintanillas, Rabé de las Calzadas and Estepar: the first one will consist of seven wind turbines, up to a total of 31.5 MW of installed power, while the second one will have four turbines that will add a further 18 MW. Valdesantos will be built in Estepar and will have three machines with a total installed capacity of 13.5 MW.
Iberdrola will also build the 10 MW Fuenteblanca wind farm in its vicinity, which will consist of 3 SG 3.4-132 wind turbines, to complete a 73 MW wind farm complex.
Cubico Sustainable Investments has acquired Arenales Solar PS, S.L., the owner of a 50 MW operational concentrated solar power (CSP) plant, from PanEuropean Infrastructure Fund, managed by DWS, a glob...
Read moreElecnor has been awarded a turnkey contract with the Insular Society of Aguas de Lanzarote SA (INALSA), owned by the Lanzarote Water Consortium, for the construction of the 9.2 MW Arrecife wind p...
Read moreInvestment company Azora has completed the acquisition of a 100 MW Cuevas de Velasco wind project located in Castilla-La Mancha from ABO Wind. The facility consists of 19 GE158 5.5-MW...
Read moreIberdrola has started the commercial operation of the 23 MW El Pradillo wind farm located between the Zaragoza towns of Frescano, Borja and Agón, in Aragón. The project comprises of six...
Read moreGalp has reached an agreement with the ACS Group to acquire, develop and build solar photovoltaic projects in Spain. The transaction provides access to an installed capacity of 2.9 GW by 2023. The acq...
Read more