The consortium of Energy China CGGC International Ltd and Supcon Solar of China has been awarded the engineering, procurement, and construction (EPC) contract for the development of a 50 MW concentrated solar power (CSP) project in Greece.
The Minos concentrated solar-powered project, features tower technology, and molten salt storage is being developed by NUR-MOH Heliothermal, a joint venture of Nur Energie Ltd and Greek oil and energy firm Motor Oil Hellas.
Prenecon, a Greek company will also take part in the construction of the plant.
The developer has also signed a financing cooperation agreement with the Industrial and Commercial Bank of China (ICBC).
Enel Green Power has brought online its new 154 MW Kafireas wind facility. Located in the Municipality of Karystos (Evia), this complex is the largest wind farm in Greece. It was built with an overal...
Read moreVestas has won a 16 MW auction-derived order from Iberdrola for the Pyrgari wind park located in Viotía, Greece. The contract includes the supply and installation of four V150-4.2 MW wind turbi...
Read moreThe Hellenic Republic Asset Development Fund (HRADF) is set to launch the sale of a 35.5% stake in the Greek oil company Hellenic Petroleum. Hellenic Petroleum, established in 1998, is one of th...
Read moreTransgaz and the Itochu Corporation of Japan signed an agreement memorandum for collaboration in big projects in the domain of natural gas – the LNG terminal in Alexandroupolis, the Whitestream...
Read moreDamco Energy, a unit of Greek group Copelouzos, agreed to buy a 10% stake in Senfluga Energy Infrastructure Holdings, which owns 66% of Greek gas grid operator DESFA. DESFA S.A. owns, operates, and m...
Read more