EDF starts the commercial operation of Desert Harvest Phase I and Phase II in California

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

EDF Renewables North America has announced the completion and commercial operation of the Desert Harvest 1 (114 MWdc) and Desert Harvest 2 (100 MWdc) Solar Projects located in Riverside County, California, USA.

The Desert Harvest 1 provides electricity to MCE under a 20-year Power Purchase Agreement (PPA), while Desert Harvest 2 supplies energy and renewable attributes to Southern California Public Power Authority (SCPPA) under a 25-year Renewable Energy Credit (REC) + Index structure contract.

The two projects are located adjacent to each other on unincorporated land in Riverside County, California, administered by the Federal Bureau of Land Management (BLM). The BLM designated this area as a Solar Energy Zone (SEZ) and Development Focus Area, land set aside for utility-scale renewable energy development. 

Both projects consist of horizontal single-axis tracking solar photovoltaic (PV) technology. Desert Harvest 2 includes a 35 MW, 4-hour energy storage system (ESS). The coupling of storage and solar demonstrates EDF Renewables’ ability to address specific challenges posed by the California “duck curve.”

Both projects generate enough clean energy to meet the consumption of up to 77,000 average California homes. This is equivalent to avoiding more than 353,000 metric tons of CO₂ emissions annually.

EDF Renewables’ Asset Optimization group will perform operations and maintenance services for the life of the Project. The group will provide NERC compliance support, remote monitoring, and balance-of-plant management to maximize power production.

Share this update