Clean Power Alliance (CPA) has signed a 15-year power purchase deal with the Chalan solar project developed by Origis Energy.
The 65 MW solar farm is currently being developed in California’s Kern County. It will be supported by a 25 MW/100 MWh of the energy storage unit.
The project is expected to be operational by December 2023.