AES Indiana, a subsidiary of The AES Corporation has entered a deal with NextEra Energy Resources, LLC to acquire and construct a 250 MW solar + 180 MWh energy storage facility in Pike County, Indiana, 125 miles southwest of downtown Indianapolis.
Connected to AES Indiana's existing Petersburg Generating Station, the project will power the equivalent of 45,000 homes during peak hours. The project is expected to bring job creation and provide lasting economic benefits to the community.
This project requires approval by the Indiana Utility Regulatory Commission (IURC). If approved, the project is expected to be operational no later than May 1, 2024. NextEra Energy Resources will develop and construct the project.
Innergex Renewable Energy Inc. has fully commissioned the 225.6 MW Griffin Trail wind facility in north Texas and concluded its tax equity funding. The facility is sited on approximately 26,000 acres...
Read moreInnergex Renewable Energy Inc. announces that the full commissioning of the 225.6 MW Griffin Trail wind facility in North Texas was achieved on July 26, 2021.
Read moreBuckeye Partners, L.P. has completed the acquisition of a 180 MW solar photovoltaic project located in Hill County in Texas from renewable energy developer, Dallas-based Belltown Power Texas, LLC...
Read moreGreenalia SA, through its unit Greenalia Solar Power Inc, has acquired a ready-to-build 670 MWp solar photovoltaic project in Texas and plans to start the construction by 2022. The reg...
Read moreEDF Renewables North America (EDFR) and the Renewable Power business within Goldman Sachs Asset Management (Goldman Sachs) have announced the commercial operation of the 28.9 MW Tom...
Read more