3Flash Solar, a Finnish renewable developer, is planning to develop a 40 MWp solar photovoltaic project located in the municipality of Imatra in eastern Finland.
The project will consist of more than 100,000 solar panels and will be situated near a local power distribution network.
The project is scheduled to be operational by 2024 and is expected to generate enough electricity to cover the consumption of about 410,000 homes.