The first batch of turbine blades for the 857 MW Triton Knoll Offshore Wind Farm has arrived at its chosen construction port in Teesside, United Kingdom.
The first 15 turbine blades to arrive at the Able Seaton Port, near Hartlepool, were manufactured by MHI Vestas at its Isle of Wight UK facility and finished at its Fawley plant across the Solent.
Triton Knoll, which is being constructed by RWE, will install and operate 90 MHI Vestas state-of-the-art V164-9.5 MW turbines, each stretching 164 meters tip to tip, and capable of powering a typical home for up to 29 hrs with a single rotation of its 80 meter long blades.
The project is located over 32 kilometers off the Lincolnshire coast, with a turbine array that covers an area of 145 square kilometers. It is jointly owned by RWE, J-Power, and Kansai Electric Power, with RWE managing the wind farm’s construction and long-term operation and maintenance, works, on behalf of its project partners.
MHI Vestas recently moved onto the 140,000 sq meter Able Seaton Port, where it is establishing a full turbine logistics and a pre-assembly hub for the RWE-managed joint venture project.
Harmony Energy has secured a planning permit for the planned development of a 30 MW solar project located near Driffield, East Riding of Yorkshire, UK. The East Riding of Yorkshire Co...
Read moreThe European Marine Energy Centre (EMEC) has joined forces with Perpetuus Tidal Energy Centre (PTEC) to develop a large-scale tidal energy site off the Isle of Wight, England. This site will be eligi...
Read moreEDF Renewables has planned to develop a 49.9 MW solar project in Tye Lane near Bramford, England. The solar park with a 35-year life span, upon planning permission, is expected to provide a com...
Read moreThe Government of Scotland has approved the development of the 105.6 MW wind project located in East Ayrshire proposed by Banks Renewables. The Lethans Wind Farm project will consist...
Read moreHellenic Cables has been awarded its biggest to-date contract for inter-array cables by DEME Offshore for the supply of approx. 650 km 66 kV inter-array cables and accessories to Dogger Bank offshore...
Read more