Statkraft has announced the acquisition of 100% of the shares in NSL Tidong Power Generation Private Limited, the project company for the Tidong hydropower project. Approximately 60% constructed, the project is located on Tidong River, a tributary of Sutlej River, in the state of Himachal Pradesh, in north-western India.
The planned installed capacity is 100 MW, although possibility for further expansion will be evaluated. The remaining construction works are expected to be completed in approximately two years.
Statkraft has extensive industrial experience from hydropower in India, with a 49% shareholding in two hydropower assets in operation in Himachal Pradesh: Malana (108 MW/340 GWh) and Allain Duhangan (192 MW/800 GWh).
Reliance Infrastructure Limited has announced the successful completion of the sale of its 100% shareholding in Integrated Mumbai Power Distribution Business to Adani Transmission Ltd. The deal was a...
Read moreReNew Power Limited has announced the successful commissioning of Phase 1 (126 MW) of its 250 MW wind project located in Kutch district of Gujarat. The 250 MW wind power project was won at a tariff o...
Read moreTotal has announced that it has signed a binding Letter of Intent (LOI) with Shell for the sale of its 26% minority equity stake in Hazira LNG regasification terminal in India. The transaction remains...
Read moreSenvion has been awarded a 250 MW conditional order by an SPV of Continuum Wind Energy Ltd. to supply and commission the entire windfarm. The Bhuj wind farm in Gujaratstate, India comprised...
Read moreEcoppia has reached an agreement for deploying its E4 robotic system in a 325 MW site in REWA solar park in the state of Madhya Pradesh, India. The site is developed by Sprng Energy, a renewable...
Read more