Senvion has been awarded a 250 MW conditional order by an SPV of Continuum Wind Energy Ltd. to supply and commission the entire windfarm. The Bhuj wind farm in Gujaratstate, India comprised of 108 Senvion 2.3M130 turbines with a hub height of 130m.
The project scope includes a 20-year comprehensive operations and maintenance (O&M) contract. The installation of the turbines is expected to start in the second half of 2019 and is planned to be completed by the beginning of 2020.