Peregrine Energy Solutions LLC has announced that it will build two battery energy storage systems (BESS) projects in Texas, USA, totaling 490 MW of renewable energy capacity. The systems were acquired from Black Mountain Energy Storage.
The two assets, Best Southwest BESS in Dallas County and Mallard BESS in Collin County, are strategically located in the Dallas-Fort Worth energy load pocket and developing congestion pockets. Peregrine is aiming for a commercial operation date of early 2025 for both assets.
Peregrine Energy Solutions LLC strives to source, develop, construct, and operate North American standalone battery energy storage and renewable energy assets to unlock value.