Nestlé has signed a 10-year power purchase agreement (PPA) with BayWa r.e., with power supplied from a new 50 MW “Picón” solar park located near Ciudad Real in Castile-La-Mancha, Spain.
The agreement will enable a new solar park that will generate 62 GWh of solar energy per year to power Nestlé’s operations in Spain and Portugal. The planned project is expected to be commissioned in the first quarter of 2023.
The energy that will be produced from the new solar project, is equivalent to an annual saving of over 70,000 tonnes of CO2, and enough electricity to power 25,000 households.
Siemens Gamesa has entered into an agreement with SSE to sell South European renewables development assets for a total cash consideration of EUR580 million (US$626 million). This sale includes a pipe...
Read moreGreenalia has announced that its proposal to develop a 33 MW wind farm in Galicia, northwest Spain, has reached a permitting milestone. The company now begins to public exhibition phase. Lamas de Fe&...
Read moreThe board of directors of Aena, which administers Madrid's Adolfo Suárez Madrid-Barajas Airport, has approved plans for a 120 MW/142.42 MWp solar PV park within the vicinity. Construccio...
Read moreCapital Energy is planning to build an 85 MW Los Corrales wind project located in Navarre Region, Spain. The Los Corrales wind project represents an investment of over EUR100 million (US$108.3 millio...
Read moreAtalaya Mining and Endesa X have joined forces to build the 50 MW solar photovoltaic project that will power a mining operation in Spain. The 60-hectare solar farm will be located in the southwe...
Read more