Nebras Power, a joint venture of Qatar Electricity and Water Company (60%) and Qatar Holding (40%), has completed the acquisition of a 9.9% stakes in the 105 MWac solar photovoltaic project in Amin.
The project is currently under construction with the target completion by December 2019.
Once operational, the energy will be sold to the Petroleum Development Oman through a 23-year PPA.
Enertis has been selected by the consortium Amin Renewable Energy Company SAOC as the owner engineer for the 100 MW Amin solar photovoltaic plant located in about 210 km North-East of Thumrait, in Oma...
Read moreAbu Dhabi-based renewable energy major Masdar has completed the first power of the 50 MW Dhofar wind project located in Dhofar Governorate in Oman. The facility consists of 13 un...
Read moreThe Oman Power and Water Procurement Company (OPWP) has invited interested consultancy firms to conduct a detailed report on demand response study for the country's electricity sector. OPW...
Read moreThe Oman Power and Water Procurement Company (OPWP), a member of Nama Group, has launched a request for qualifications (RFQ) for the development of two solar photovoltaic farms each with a genera...
Read moreOman Power and Water Procurement Company (OPWP) has announced the award of Ibri II solar project. The conditionally winning consortium, comprising Saudi-based Acwa Power, Kuwait-based Gulf Investment...
Read more