Geronimo Energy (Geronimo), a part of National Grid, and Big Rivers Electric Corporation (Big Rivers) have signed a Power Purchase Agreement (PPA) for the Unbridled Solar Project (Unbridled Solar) in Henderson and Webster Counties, Kentucky.
Unbridled Solar is a 160 megawatt (MW) clean solar energy project located in the Midcontinent Independent System Operator (MISO) market.
Anticipated to begin operations at the end of 2023, Unbridled Solar is currently the largest solar project development in the state of Kentucky. Using the United States’ Environmental Protection Agency’s (EPA) greenhouse gas equivalencies calculator, the project is estimated to offset carbon dioxide emissions by 255,000 metric tons annually.
The Hawaiian Electric Company, Inc. has selected ENGIE’s project as one of sixteen in the Final Award Group for the Stage 2 Variable Renewable Dispatchable Generation and Energy Storage projects...
Read moreThe Bureau of Land Management Palm Springs-South Coast Field Office has released for public comment a draft Environmental Assessment on the Mesa Wind Repower Project, located on public lands 11 miles...
Read moreThe Ohio Power Siting Board (OPSB) has approved the environmental permit for the planned 20.7 MW Icebreaker offshore wind project in Lake Erie proposed by the Lake Erie Energy Developme...
Read moreSGH2 energy is launching the world’s largest green renewable hydrogen facility in partnership with the City of Lancaster, California. The Lancaster plant will feature SGH2’s pioneering tec...
Read moreSouthern Power, has completed the acquisition of the 56-megawatt (MW) Beech Ridge II Wind Facility from Invenergy. Located in Greenbrier County, West Virginia, Beech Ridge II was developed by In...
Read more