ERG has completed the commissioning phase for Parc Eolien de la Vallée de Torfou (17.6 MW - estimated average annual output 47 GWh), a wind farm forming part of the 768 MW of assets under construction and being developed by Epuron, and for Parc Eolien Vallée de l'Aa 2 (13.2 MW - estimated average annual output 29 GWh), corresponding to an overall total of around 45,000 t of avoided CO2 emission per annum.
Both of these wind farms, located respectively in the Loire Valley and Hauts-de-France (Upper France) regions, have observed the Commercial Operation Date scheduled for the end of 2018 and will therefore be entitled to benefit from the 2014 Feed-in Tariff (FIT) for a period of 15 years.
German energy company innogy SE and French renewable energy trader BCM Energy SAS through its energy supplier Planète OUI have signed an innovative Power Purchase Agreement (PPA): from the begi...
Read moreAlbioma has completed the takeover of the French unit of Eneco and solar developer Eneco France. Eneco France is engaged in the development, construction and operation of solar p...
Read moreBoralex Inc. has agreed the purchase of wind project developer Ecotera Development and its 100 MW wind portfolio consists of eight wind farms. In 2015, Boralex has acqu...
Read moreVoltalia has announced the beginning of the construction of the Savane des Pères facility, a 3.8 MW solar plant with a 2.6 MW / 2.9 MWh lithium-ion battery system, located in French Guiana...
Read moreABO Wind has sold a second project portfolio of French wind farms to CEZ. The new portfolio consists of eight wind farms with a total capacity of 116.5 megawatts in different planning stages. Accordi...
Read more