Castlecraig Wind Farm, a 10-turbine wind farm located near Drumquin in Co. Tyrone is set to be fully operational by late summer as the construction phase comes to an end. The project will produce enough energy to meet the needs of over 18,500 homes annually.
Construction started in June 2017 with a number of local firms involved including Adman from Omagh which undertook the civil construction works, B.McCaffrey & Sons Ltd and Colton Quarries who provided stone, Tracey Concrete from Enniskillen, Lisburn based Mar-Train Heavy Haulage, along with local staff from Barton Industrial Services and Omexom from their Belfast offices.
Geminor has signed a 25-year contract to supply a maximum of 50,000 tonnes of waste per annum to the Allerton Waste Recovery Park in North Yorkshire, owned by Amey. The waste-to-energy plant, wh...
Read morePlans have been announced for a new energy-from-waste in UK to be developed by PMAC Energy. The waste-to-energy plant will be situated in a 25 acres site at Redcar Bulk Terminal (RBT) on the South Ba...
Read moreWren House Infrastructure Management was sellected as the successful bidder in the auction for the acquisition of North Sea Midstream Infrastructure Partners (NSMP) from ArcLight. Wren House...
Read moreForesight Group has announced that it has completed the acquisition of an operational Anaerobic Digestion plant on the Isle of Wight, located off the south coast of England, for an undi...
Read moreHBS New Energies (HBS) has completed the first installation of a 30 MWp solar portfolio located in the East of England. The solar PV plants are to be designed and installed by HBS New E...
Read more