Financial close achieved for 100 MW/150 MWh battery storage project in Australia

Subscribe to our newsletter and get the latest news and business opportunities in your inbox
Financial close achieved for 100 MW/150 MWh battery storage project in Australia

Vena Energy Australia has announced the Financial close for the 128.5 MW Tailem Bend 2 Hybrid Project located in Queensland, Australia. 

The project comprises an 87 MW solar farm and 41.5 MW of Battery Energy Storage System (BESS). Once complete the hybrid project will have the capacity to generate enough energy to power approximately 35,000 homes with clean energy annually, reducing more than 207,000 tons of CO2 Greenhouse Gas Emissions or the equivalent of planting more than 3.4 million trees. 

During the financial close the hybrid project is supported by DBS as the Joint-Green Structuring Bank, Technical Coordinator, Facility Agent and Project Account Bank, ING as the Joint-Green Structuring Bank and Financial Model Coordinator, and Siemens Financial Services through Siemens Bank.

UGL Limited will be responsible for the engineering, procurement, and construction of the solar project while Doosan GridTech act as the head contractor for the BESS. Construction of the solar project commenced in April 2022, and the BESS project will commence later in the year. 

List of country news

Country news

  • June 22, 2022

    Snowy Hydro signs PPA for 414 MW wind farm in Australia

    Snowy Hydro has signed a contract for power purchase and renewables certificate from the 414 MW wind project in New South Wales

    Read more
  • June 01, 2022

    ACEN commenced a 50 MWh battery project within 720 MW solar farm in Australia

    ACEN Australia has announced the successful commencement of a 50 MWh battery project connected to its New England Solar Farm in Uralla, New South Wales.

    Read more
  • May 30, 2022

    CS Energy signs MOU for 230 MW onshore wind farm in Australia

    EDF Renewables has signed a Memorandum of Understanding (MoU) with CS Energy for the development of the 230 MWp Banana Range wind project.

    Read more
  • May 23, 2022

    J-Power signed development agreement for 200 MW wind farm in Australia

    J-POWER has signed an agreement with Genex Power Limited for joint development on the Kidston Stage-3 Wind Project (K3W) in Australia.

    Read more
  • May 20, 2022

    240 MWp/480 MWh BESS project in Australia receives Grid-connection approval

    Maoneng has secured a grid-connection assessment approval from the Australian Energy Market Operator to connect the standalone 240MWp / 480MWh Battery Energy Storage System (BESS).

    Read more

Share this news

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.