Ørsted has completed the divestment of 50% of the 605 MW Greater Changhua 1 Offshore Wind Farm to global investment group Caisse de dépôt et placement du Québec (CDPQ) and Cathay PE.
Greater Changhua 1 Offshore Wind Farm is located in the Taiwan Strait off the coast of Changhua County. The facility features SG 8.0-167 DD offshore wind turbine. The 167-meter diameter rotor has a swept area of 21,900 m2, and utilizes the SGRE B81 blades, each measuring 81.4 meters.
NHOA (formerly Engie EPS), majority-owned by Taiwan Cement Corp (TCC), has been selected by TCC to supply technology equipment and build two battery energy storage system projects in Taiwan. Th...
Read moreOffshore Wind Consultants Ltd (OWC), a unit of Norwegian energy consultancy Aqualis ASA, has secured the owner's engineer role for the proposed 1,044 MW hail Long offshore wind farm project locat...
Read moreCopenhagen Infrastructure Partners (CIP), on behalf of the funds Copenhagen Infrastructure II K/S (CI-II) and Copenhagen Infrastructure III K/S (CI-III), has entered into an agreement to divest a 25%...
Read moreFoundOcean has secured a contract to provide foundation grouting for a 100-turbine offshore wind project in Taiwan. The contract is expected to create 30 new jobs at the Livingston-based company. Fou...
Read moreJan De Nul Group has completed the installation of all 21 offshore wind turbines for the 109.2 MW Taiwan Power Company Offshore Windfarm Phase 1 Project – Demonstration, including the installati...
Read more