Facebook buys power from Apex Clean Energy's 80 MW Altavista Solar project in Campbell

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

Apex Clean Energy has signed a power purchase agreement with Facebook, buying 61.6 MW portion of 80 MW Altavista Solar in Campbell County, Virginia, when it becomes operational in 2020.

In August, Facebook signed a 200 MW PPA with Apex's 525 MW Aviator Wind East project in Coke County, Texas. The Aviator Wind East project is scheduled to be commissioned in 2020.

The Altavista Solar project will help support Facebook’s operations in Virginia and will help the company make strides toward its dual targets of reducing greenhouse gas emissions by 75% and supporting 100% of its operations with renewable energy in 2020.

Altavista Solar will generate approximately 200 full-time jobs during construction and over US$$1.8 million in local tax revenue over the project’s 35-year lifetime.

List of the country updates

Country updates

  • November 25, 2019

    Black Hills Corp to add up to 200 MW of renewable energy to its Southern Colorado System

    Black Hills Corp's Colorado Electric utility subsidiary has submitted a proposal to the Colorado Public Utilities Commission seeking approval of a plan that would add up to 200 megawatts of new, low-c...

    Read more
  • November 22, 2019

    New Energy Solar to divest 325 MW of solar in USA

    New Energy Solar will run a formal sale process for a part interest in two of its US solar plant assets, a 49% interest in Boulder City in Nevada and a 50% interest in Mount Signal 2 in California. Th...

    Read more
  • November 21, 2019

    DIF Infrastructure V completes takeover of BluEarth Renewables

    DIF Infrastructure V has completed the acquisition of the BluEarth Renewables LP from the Ontario Teacher's Pension Plan.  The transaction was subject to receipt of usual and customary regulator...

    Read more
  • November 21, 2019

    IEA to build 150 MW Boiling Springs wind project in Oklahoma

    Infrastructure and Energy Alternatives, Inc has been commissioned to build a US$50 million wind farm in Oklahoma.  The award is for the construction of the Boiling Springs Wind Farm in Woodward...

    Read more
  • November 21, 2019

    250 MW solar PV park commissioned in USA

    Innergex Renewable Energy Inc. has commissioned 250 MWAC/315 MWDC Phoebe solar photovoltaic farm located in Winkler County, Texas. With an average annual power generation expected to be sufficient to...

    Read more

Share this update