Neoen Australia, a unit of the French renewable power producer Neoen SA, has started the full-scale commercial operation of its Bulgana Green Power Hub located in Stawell in the state of Victoria, Australia.
The hybrid power plant consists of a 204 MW wind farm comprising 56 turbines and a 20 MW/34 MWh Tesla battery. It has the capacity to generate 750,000 MWh of clean energy annually, enough to power around 150,000 homes.
Bulgana Green Power Hub is underpinned by a 15-year Support Agreement with the Victorian Government, contributing towards the state’s Victorian Renewable Energy Target (VRET) of 50% by 2030. The project created 150 construction jobs. Neoen has invested about AUD350 million (US$254.09 million) to develop the project.
Neoen has started operating its 300 MW / 450 MWh Victorian Big Battery, one of the largest batteries in the world.
Read moreA Memorandum of Understanding (MOU) has been signed between ACCIONA Energía and Stanwell Corporation to supply solar energy to 3 GW hydrogen plant in Australia.
Read moreGPG, a joint venture of Naturgy Energy Group SA and Kuwait Investment Authority (KIA), has started the commercial operations of the 180 MW Berrybank wind project located in the state of Victoria, Australia.
Read moreSouth Australia’s Minister for Planning and Local Government has approved Maoneng’s Gould Creek Battery Energy Storage System project near Adelaide.
Read moreIndonesian Government announced that it has recommended the AAPowerLink route through Indonesian waters, approved the subsea survey permit and welcomes Sun Cable’s investment in Indonesia.
Read more