Operations started for the 88 MW/352 MWh Battery Energy Storage System in USA

Subscribe to our newsletter and get the latest news and business opportunities in your inbox
Operations started for the 88 MW/352 MWh Battery Energy Storage System in USA

Leeward Renewable Energy (LRE), LLC, announced that its 88 MW/352 MWh Chaparral Springs Battery Energy Storage System (BESS) is now fully operational in Kern County, California, USA.

Designed to strengthen grid reliability and deliver flexible, dispatchable power, the BESS is part of a broader, multi-phase initiative that also includes a 174 MW photovoltaic (PV) solar facility—both developed, owned, and operated by LRE.

Chaparral Springs BESS is a 4-hour energy storage system designed to store solar energy during low-demand periods or when solar production exceeds grid capacity. This stored energy can be dispatched during peak demand or when solar is unavailable, enhancing overall grid stability and flexibility. The energy generated will serve Peninsula Clean Energy and Valley Clean Energy under two 15-year power purchase agreements (PPAs).

LRE’s six operating projects in California now deliver enough clean electricity to power approximately 184,445 homes annually while offsetting nearly 198,410 metric tons of carbon dioxide equivalent emissions each year.

 

List of country news

Country news

  • April 30, 2025

    127 MWdc Solar PV project becomes operational in USA

    Recurrent Energy, a subsidiary of Canadian Solar Inc. held a tour and ribbon cutting ceremony at Bayou Galion Solar, a 127 MWdc solar project located in Northeast Louisiana, USA.

    Read more
  • April 11, 2025

    Commercial operation started for 600 MW Solar project in USA

    Vesper Energy celebrated the commercial operation of its 600 MW Hornet Solar project located in Swisher County, West Texas, USA.

    Read more
  • February 13, 2025

    500 MW Solar Farm Gets Green Light For Construction in USA

    Hecate Energy LLC and Greenbacker Renewable Energy Company announced that the 500 MW Cider Solar Farm is moving forward with construction as approved by the New York Office of Renewable Energy Siting and Transmission (ORES).

    Read more
  • February 11, 2025

    Commercial Operation started for 375 MWdc/300MWac Solar+Storage Project in USA

    EDF Renewables North America (EDFR) and Power Sustainable Energy Infrastructure Inc. (PSEI) announced that their jointly owned 375 MWdc/300MWac solar, combined with a 150 MWac/4-hour battery energy storage system (BESS) Desert Quartzite Solar Plus Storage Project achieved operational status.

    Read more
  • January 13, 2025

    EDF Renewables announced operations of 577 MW Solar project in USA

    EDF Renewables and Enbridge have launched the 577 MWac/749 MWdc Fox Squirrel Solar project spread across approximately 3,444 acres in Madison County, Ohio, USA.

    Read more

Share this news

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.