North Star Renewables signs USD374.15 million SOVs contract for 3.6 GW Offshore wind farms in UK

Subscribe to our newsletter and get the latest news and business opportunities in your inbox
North Star Renewables signs USD374.15 million SOVs contract for 3.6 GW Offshore wind farms in UK

The Dogger Bank A and B phases of the Dogger Bank wind farm have awarded UK-based North Star Renewables contracts for delivering three service operation vessels (SOVs) for the operation of these phases. The total value of the contracts including options is estimated at about GBP270 million (US$374.15 million).

The three SOVs will incorporate the latest technology, including a hybrid battery solution and power-to-shore to reduce fuel consumption and emissions. Each vessel will have dynamic positioning (DP2) capability, with walk-to-work gangways for safe transfer of personnel and equipment to and from the turbines. Using these gangways means that technicians will be able to transfer safely in wave heights above 3 meters, increasing the productive time on turbines and optimising wind farm availability.

SSE Renewables is the operator during the construction phase of the wind farm and Equinor will be the operator during the operations and maintenance phase. Dogger Bank will be the largest offshore wind farm in the world when complete in 2026, and is being built in three equal phases of 1.2 GW; Dogger Bank A, B and C.

North Star will deliver one SOV to be used for scheduled maintenance at Dogger Bank A and B. The vessel is due to be delivered in January 2024 and will also serve Dogger Bank C when this phase of the wind farm is operational. All three contracts will run for a fixed period of 10 years and include three one-year options.

Dogger Bank A and B reached financial close in November 2020, securing the largest ever project financing in offshore wind. The third phase, Dogger Bank C, is being developed on a different timescale and is owned by Equinor (50%) and SSE Renewables (50%). Financial Close is expected in late 2021.

 

Share this news

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.