Financial Close reached for 219 MW Solar Project in South Africa

Subscribe to our newsletter and get the latest news and business opportunities in your inbox
Financial Close reached for 219 MW Solar Project in South Africa

Etana Energy has reached financial close with renewable energy developer Mulilo on a 219 MW solar PV project near Orkney in South Africa’s North West Province.

Mulilo’s 219 MWdc utility-scale solar photovoltaic project, which has an export capacity of 150 MWac, was successfully delivered through the collaboration of Mulilo and a consortium of prominent South African financing, legal, and advisory partners, including Absa Bank, Standard Bank South Africa, Fasken, Arup, PepperTree Capital, and ENS Africa. Once operational, the Orkney project is expected to produce around 478 GWh of renewable electricity annually, which will be wheeled to Etana’s customers via the national and municipal distribution networks. The supply will displace over 500,000 tons of CO₂ emissions per year, which is equivalent to removing around 140,000 internal combustion engine vehicles from the road. This is the second project that has achieved financial close between Etana Energy and Mulilo in 12 months, and is a testament to the strength and speed that can be achieved through partnership.

Etana Energy has secured financial close on over 500 MW of renewable energy capacity in the past year, including the previously announced 105 MW Du Plessis Dam Solar PV2 project as well as the 100 MW Zen and 94 MW Bergrivier wind farms. In addition, Etana is already wheeling electricity to Growthpoint Properties sites nationwide from the 5 MW Boston hydroelectric plant in the Free State, which achieved commercial operation in October 2025.

List of country news

Country news

  • February 23, 2026

    300 MW/660 MWh Hybrid Solar and Battery Energy Project Achieves Financial Close in South Africa

    SOLA Group has reached financial close and begun construction on the Naos-1 hybrid solar and battery energy project with corporate partners Sasol and Air Liquide, near Viljoenskroon in South Africa's Free State province.

    Read more
  • October 23, 2024

    Financial close achieved for 103 MW/412 MWh battery energy storage system in South Africa

    Scatec ASA has reached financial close for the 103 MW/412 MWh Mogobe battery energy storage system (BESS) facility and is now making final preparations to start construction of the project located near Kathu, Northern Cape, South Africa.

    Read more
  • May 02, 2024

    PPA signed for a 120 MW Solar project in South Africa

    AMEA Power has announced the signing of a 20-year Power Purchase Agreement with Eskom, for the 120 MW Doornhoek Solar Photovoltaic (PV) Project located near the town of Klerksdorp in the North West Province, South Africa.

    Read more
  • December 05, 2023

    Preferred bidder selected for 103 MW/412 MWh battery energy storage project in South Africa

    The Department of Mineral Resources and Energy has awarded preferred bidder status to Scatec ASA for the 103 MW/ 412 MWh Mogobe (Ferrum) battery energy storage project in South Africa.

    Read more
  • March 14, 2023

    Tender issued for 513 MW battery energy storage projects in South Africa

    The Department of Mineral Resource and Energy (DMRE) of South Africa has launched a request for proposal (RFP) tender for the development of five energy storage facilities.

    Read more

Share this news

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.